编者按:精品学习网项目管理师考试频道为参加2012年项目管理考试的考生朋友搜集整理2012年项目管理认证练习题(中英文),供大家参考复习!在此祝愿大家考试成功!
1. If a risk event has a chance of occurring 15 times out of 45 times, based on experiences with like events, what is the probability that the event will occur on the next project?
90%
45%
15%
33%
如果一个风险事件的发生机会是45次中出现15次, 基于类似事件的经验, 在下个项目上,这个风险事件发生的概率是多少?
a. 90%
b. 45%
c. 15%
d. 33%
2. During which phase of a project is the level of uncertainty the greatest?
Design
Development/Execution
Conceptual
Phase-out
在项目的哪一阶段, 不确定性程度最大?
a. 设计
b. 开发/实行
c. 构思立项
d. 结束
3. The expected value of a risk event is calculated by multiplying the .
Likelihood of the event by the consequence of its occurrence
Likelihood of the event by the number of risk events
The number of risk events by the consequences of their occurrence
The likelihood of the greatest risk event by the consequence of the smallest risk event
计算风险事件的期望值是通过乘上什么
a. 事件发生的可能性乘以事件发生的结果
b. 事件发生的可能性乘以风险事件发生次数
c. 风险事件发生次数乘以事件发生的结果
d. 最大风险的事件发生可能性乘以最小风险的事件的发生的结果
4. Which of the following is not an external, unpredictable risk?
Changes in government regulations
Natural disasters
Vandalism
Inflation
下面哪一事项不是一个外部的不可预测的风险?
a. 政府管制的变化
b. 自然灾祸
c. 有意的破坏
d. 通货膨胀
5. The techniques and methods used to reduce or control risk are part of which of the following mechanisms:
Risk assessment
Risk response planning
Lessons learned
Risk analysis
用来减少或者控制风险的技术和方法是下列哪一机制的一部份:
a. 风险评估
b. 风险应变规划
c. 经验教训学习
d. 风险分析